GIN persp v2

Ground breaking in Stuttgart-Wangen

The construction work on the Depot Gingener Straße in Stuttgart-Wangen has started.  In the west, on Gingener Straße, a compact operations building is placed. At right angles to it, in the southern part of the site, is a large, open roof that combines the parking spaces of the Stuttgart waste management company at this location. The two new buildings are consistently designed as a structural timber construction or timber hybrid construction. The completion of the facility is planned for 2024.